"Time-in-status history" dashboard template
This dashboard shows how much time open Jira work items have spent in their current and past statuses. This will help you understand if your processes have been improving over time. It only analyzes work items that are either in “To do” or “In progress” status. The time-in-status trend displays data for all work items in the statuses shown in the charts during a specific time frame, as shown along the x-axis.
Time in current status is calculated in days, rounded up to the next nearest value. For example, if a work item was in “To do” status from May 8th, 2023 to May 12th, 2023, its time in status will be five days. Similarly, if a work item enters and exits the "To do" status on the same day, the “Time in current status” will count as one day. You can include or exclude weekends in the time calculations using the Weekends control on this dashboard.
You can filter the entire dashboard by date range, Jira project, date bucket (to change the date format on the x-axis), work type, work item labels, work item assignee, and exclude weekends from the calculations.
Overview of time-in-status trend for all open status types
This section contains the following chart:
Average time in status for all open statuses
Displays the average time in the current status, in days, for all work items that were in the statuses depicted in the chart at any given time within a specified time period, as shown along the x-axis.
Detailed analysis of time-in-status trend over time
In this section, you can analyze a particular work item status in more detail by selecting a value for Status filter.
This section contains the following charts:
Average time-in-status trend
Displays average time in current status in days, and count of work items at any point within a given time period, as shown along the x-axis.
Average time-in-status trend per work type
Displays average time in current status in days per work type within a given time period, as shown along the x-axis.
Average time-in-status trend per assignee
Displays average time in current status in days per work item assignee within a given time period, as shown along the x-axis.
Status history details for selected status within selected date range
Table showing work item details with links to Jira work items (Work item key column)
Work item status history details
In this section, you can analyze the status change history for a single Jira work item by inputting the work item key in the Work item key input box.
This section contains the following chart:
Status transition details table
Table showing work item status history details with a link to the Jira work item (Work item key column)
Was this helpful?